Case Studies - Here East

Site address: Here East
Customer: Broadcast Centre
Consultants: Arup Group
Architects: Hopkins.

 

Contractual Requirements

  • To install a Fire Alarm system to BS5839, Pt 1, Type L1.
  • To provide a fully integrated Sprinkler monitor panel and Fireman’s Control panel, c/w all the necessary interfaces & monitors.
  • To install Fireman’s telephone & Disabled refuge system.

Methodology Of The Fire  Alarm and Detection System :-

Here East

The former Broacast Centre (IBC) will be transformed into a mixed use community of offices, retail, education facilities and television studios with a world class data centre at its core. The former Press Centre (MPC) will offer high quality, flexible office accommodation along with retail facilities, restaurants and a public entrance to the former Main Media Conference Room (MMCR), which will be developed into a 1000 seat auditorium between the buildings at the heart of the development.

Here East

Here East

Here East

Here East

 

Copyright 2012 © MECE - Civil Engineers and Commercial Builders